Wczytuję dane...
Indeks towaru: SILNIK 2,2 CRD
Realizacja zamówienia: 24

WYMIANA USZCZELKI GŁOWICY

 Labor Operations: Click to display a list of Labor Operations associated with this procedure
 Special Tools: Click to display a list of tools used in this procedure

WARNING:
NO FIRE, OPEN FLAMES OR SMOKING. SERVICE VEHICLES IN WELL VENTILATED AREAS. RISK OF POISONING FROM INHALING OR SWALLOWING FUEL. RISK OF INJURY FROM SKIN AND EYE CONTACT WITH FUEL. WEAR PROTECTIVE CLOTHING.



NOTE: Thoroughly clean all mating surfaces with appropriate solvents and blow out bolt holes, to assure that no grease or oil is present during reassembly.

NOTE: If piston or connecting rods have been replaced, measure piston projection.

NOTE: Check facing cylinder head contact surface.

1. Position the cylinder head and gasket properly on engine using the dowel pins as guide.

NOTE: Inspect all cylinder head bolts for defects and stretching before installation.

The M12 cylinder head bolts must be torqued in 3 stages.

2. Install cylinder head assembly on engine block.

3. Install M12 cylinder head bolts finger tight.

4. Torque bolts in numeric order starting with number 1 to 60 N·m (44 lbs.in.).

5. Install M8 timing chain cover to cylinder head bolts. Tighten to 20N·m (177 lbs.in.).

6. Tighten M12 cylinder head bolts in numeric order starting with number 1 an additional 90° .



7. Connect vacuum hose at turbocharger waste gate solenoid.

8. Connect intake manifold inlet tube (3) at intake manifold (1).

9. Connect EGR valve to mixing chamber pipe at EGR valve (refer to section 25).

10. Connect oil dip stick tube. Tighten to 14 N·m (124 lbs. in.).



11. Install intermediate timing chain gear (5).

12. Install camshafts - INSTALLATION).

13. Install vacuum pump 

14. Install high pressure pump 



15. Install cylinder head front cover (5) and top guide rail (1)



16. Install timing chain tensioner (1) with new seal (2). Tighten to 80N·m (59 lbs.ft.).



17. Remove Camshaft Locking Pin (1).



18. Install cylinder head cover (2) - INSTALLATION).

19. camshaft position sensor connector (1).



20. Reposition engine electrical harness and connect the fuel injector (1), glow plug (2), and coolant temperature electrical connectors.



21. Install fuel injectors (5) and high pressure lines (3) (refer to section 24).



22. Raise vehicle on hoist.

23. Install turbocharger support bracket (1). Tighten bolts to 30N·m (22 lbs.ft.).

24. Install oil return flow line at turbocharger.



25. Remove Crankshaft Lock (2).

26. Install starter.

27. Install charge air distribution pipe refer to section 11).



28. Install engine compartment lower silencer (1) and accessory drive belt splash shield (2).

29. Lower vehicle.



30. Install air cleaner housing (6) and turbocharger air intake hose (1).

31. Install coolant recovery pressure container (refer to section 7) .

32. Connect upper radiator hose to thermostat housing.

33. Install radiator closure panel 



34. Install front grille assembly (2)

35. Refill cooling system with proper coolant mixture to proper level (refer to section 7).



36. Connect negative battery (1) cable located under passenger seat.



 

 

 

 

 

 

 

 

 

 

CYLINDER HEAD FRONT COVER

Labor Operations: Click to display a list of Labor Operations associated with this procedure

 



NOTE: Thoroughly clean all mating surfaces with appropriate solvents to assure that no grease or oil is present during reassembly.


NOTE: Dowel pins are used as a guide during assembly and must remain in the proper position to assure a good sealing surface.

1. Apply sealant to the marked surfaces with a bead thickness of 1.5 ± 0.5 mm.

 

NOTE: Install front cover of cylinder head within 10 minutes after applying sealant. Do not spread sealing bead.




2. Raise locking pawl (3) of top guide rail and guide front cover (5) onto guide pins.

3. Install bolts attaching front cover (5) Tighten bolts to 14N·m (124 lbs. in.).

 

NOTE: Timing chain tensioner must be installed with a new seal.

4. Install timing chain tensioner (7) and new seal (6)




5. Connect negative battery (1) cable located under passenger seat.

WARNING:
Use extreme caution when the engine is operating. Do not stand in a direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothes.

6. Start the engine and inspect for leaks.




 

 

 

 

 

 

 

 

 

CYLINDER HEAD GUIDE RAIL

Labor Operations: Click to display a list of Labor Operations associated with this procedure



1. Carefully position the top guide rail (1) onto the dowel pins (4).

2. Counter hold the camshaft with an open end wrench and install driver of inlet camshaft sprocket. Tight bolt to 50N·m (37 lbs. ft.).

3. Carefully raise locking pawl (3) of top guide rail (1) and install cylinder head front cover 

4. Install timing chain tensioner (7) with new seal (6)

5. Install cylinder head cover (2) - INSTALLATION).




6. Reconnect negative battery (1) cable.




WARNING:
USE EXTREME CAUTION WHEN THE ENGINE IS OPERATING. DO NOT STAND IN A DIRECT LINE WITH THE FAN. DO NOT PUT YOUR HANDS NEAR THE PULLEYS, BELTS OR FAN. DO NOT WEAR LOOSE CLOTHES.

7. Start engine and inspect for leaks.

8. Install engine cover (2)

  

 

Engine, 2.2L Diesel CAMSHAFT INSTALLATION

Labor Operations: Click to display a list of Labor Operations associated with this procedure
Special Tools: Click to display a list of tools used in this procedure

CAUTION: The camshafts are sensitive to fracturing. Ensure they are installed free of stress.

CAUTION: Pay attention to assignment of camshafts. Camshaft code numbers are visible on the thrust collar of the axial bearing.

CAUTION: Oil bucket tappets and camshaft bearing points. Inspect ease of operation of bucket tappets.



1. Install inlet (3) and exhaust (2) camshafts.

CAUTION: Install camshafts so that the two holes in camshaft sprockets are positioned opposite and the markings of the camshaft and camshaft bearing cap are aligned.

2. Align inlet (3) and exhaust (2) camshafts at axial bearing - STANDARD PROCEDURE).

3. Position piston of cylinder #1 to 30° TDC.



NOTE: Pay attention to markings on camshaft bearing caps.

4. Install camshaft bearing caps in the proper order. Tighten bolts to 9N·m (80 lbs. in.).




CAUTION: Do not rotate engine counter clockwise.

5. Position the piston of cylinder #1 to ignition TDC.

 

NOTE: Pay attention to markings on camshaft bearing caps.

6. Install the bearing caps in reverse order at the same point. Tighten bearing cap bolts evenly in steps each of 1 turn.

 

NOTE: The piston of cylinder #1 must be positioned at ignition TDC when the inlet camshaft is locked.

7. Insert Camshaft Locking Pin (7) in through the first camshaft bearing cap into the whole in the camshaft sprocket.

 

NOTE: Do Not use old camshaft sprocket bolts.

8. Fit exhaust camshaft sprocket with timing chain (1) onto exhaust camshaft paying attention to position of dowel pin. Tighten bolt to 18N·m (159 lbs.in.).




9. Install timing chain tensioner (1) with new seal (2)




10. Inspect/Set basic position of camshafts - STANDARD PROCEDURE).

11. Remove Crankshaft Lock .

12. Install starter.

13. Remove Camshaft Locking Pin  (7).




14. Install cylinder head cover (2) - INSTALLATION).

 

NOTE: Refer to the appropriate injector servicing procedures for cleaning of injectors and recesses.

15. Clean and install injectors




16. Connect negative battery (1) cable.

WARNING:
Use extreme caution when the engine is operating. Do not stand in a direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing.

17. Start engine and inspect for leaks.




18. Install engine cover (2)

 

 

 

 

 

 

 

 

 

 

 TABELA WARTOŚCI MOMENTÓW DOKRĘCANIA

DESCRIPTION

N·m

Ft. Lbs.

In. Lbs.

Crankcase Ventilation
Screw-Air Charge Distribution Pipe to Air Charge Distribution Panel 11 - 97
Cylinder Head
8m-Bolt- Cylinder Head to Timing Case Cover 20 15 -
Bolt-Front Cover to Cylinder Head 14 - 124
12m-Bolt-Cylinder Head to Crankcase (3 stages, torque, torque angle, torque angle) 60, 90°, 90° 44, 90°, 90° -
Crankcase, Timing Case Cover, End Cover
Bolt-Crankshaft Bearing Cap to Crankcase (2 stages, torque, torque angle) 55, 90° 40, 90° -
Bolt-End Cover to Crankcase 9 - 80
Bolt-Timing Case Cover to Crankcase 20 15 -
Plug-Coolant Drain to Crankcase 30 22 -
Oil Pan
6m-Bolt-Oil Pan to Crankcase 9 - 80
8m-Bolt-Oil Pan to Crankcase 20 15 -
Bolt-Oil Pan to End Cover 9 - 80
Bolt-Oil Pan to Timing Case Cover 9 - 80
Bolt-Oil Pan to Transmission Bell Housing 40 30 -
Plug-Pil Pan to Oil Drain 47 35 -
Connecting Rod
Bolt-Connecting Rod Cap to Connecting Rod (3 stage, 1AND2 torque, 3 torque angle) 5,25,90° - 44,221, 90°
Crankshaft
Bolt-Crankshaft Bearing Cap (2 stage, 1 torque, 2 torque angle 55,90° 40.5, 90° -
Flywheel, Driven Plate, Vibration Damper, Starter Ring Gear
8.8m-Bolt-Central Bolt of Vibration Damper (2 stage, 1 torque, 2 torque angle) 200,90° 147.5, 90° -
10.9m-Bolt-Central Bolt of Vibration Damper (2 stage, 1 torque, 2 torque angle) 325,90° 240, 90° -
Bolt-Stretch Shank for Flywheel or 2 Mass Flywheel to Crankshaft (2 stage, 1 torque, 2 torque angle) 45,90° 33, 90°
Turbo Charger
Bolt-Oil Feed Line to Cylinder Head 9/22 - 80-194
Bolt-Oil Feed Line to Turbo Charger 30 22 -
Bolt-Turbo Charger Support 30 22 -
Bolt-Turbo Charger Support to Crankcase 20 - 177
Bolt-Oil Outlet Line to Turbo Charger 9 - 80
Connection-Flange of Exhaust Manifold to Turbo Charger 30 22 -
Connection-Turbo Charger to Front Catalytic Converter 30 22 -
Charge Air Pipe/Charge Air Cooling
Bolt-Charge Air Distribution Pipe 16
-
141
Bolt-Inlet Port Shut Off Positioning Motor to Air Charge Distribution Pipe 9 - 80
Bolt-Support to Charge Air Distribution Pipe 20 - 177
Bolt-Support to Engine Bracket 40 30 -
Clamp-Charge Air Pipes/Hoses 3 - 27
Belt Tensioning Device
Bolt-Guide Pully to Coolant Pump 35 26 -
Bolt-Guide Pully to Timimg Case Cover 35 26 -
Bolt-V-Belt Tensioning Device to Tensioning Pully 36 26.5 -
Bolt-V-Belt Tensioning Device to Timing Case Cover 30 22 -
Exhaust Manifold
Nut-Exhaust Manifold at Cylinder Head 30 22 -
Position Sensor
Nut/Bolt-Camshaft Position Sensor to Cylinder Head Cover 11 - 97
Nut/Bolt-Crankshaft Position Sensor to Engine Block 8 - 70
Pre-Glow System
Cylinder Head to Glow Plug 12 - 106
Starter
Bolt-Starter to Crankcase 42 31 -
Nut-Connection of Circuit 30 14 - 124
Nut-Connection of Circuit 50 6 - 53
Alternator
Bolt-Generator to Timing Case Cover 20 15 -
Bolt-Generator to Cooler Housing 6 - 53
Bolt-Cooler Housing of Generator to Crankcase 20 - 177
Nut-B+ Circuit to Generator 13-18 - 115-159
Nut-D+ Circuit to Generator 5 - 44
Nut-Collar to V-Belt Pully 80 59 -
Oil Pump
Bolt-Oil Pump to Crankcase 18 - 133
Bolt-Oil Pipe to Crankshaft Bearing Cap 8 - 70
Oil Filter
Screw Cap to Oil Filter 25 18.5 -
Oil Cooling System
Bolt-Oil-Water Heat Exchanger to Timing Cover Case 15 - 133
Oil Level Pressure
Bolt-Dip Stick Guide Tube to Cylinder Head 14 - 123
Bolt-Oil Level Sensor to Oil Pan 14 - 123
Coolant Pre- Heater
Coolant Pre-Heater in Engine Block 35 26 -
Engine Cooling General
Bolt-Belt Pully to Coolant Pump 8-35 6-26 -
Bolt-Coolant Pump to Timing Case Cover 6m/8m 14/20 10-15 -
Bolt-Thremostat Housing to Cylinder Head 9 - 80
Coolant Drain Plug to Crankcase 30 22 -
Engine Suspension, Engine Mount, Engine Bracket
Bolt-Engine Bracket to Crankcase (2 stage, torque, torque angle) 20, 90° 15, 90° -
Bolt-Engine Mount to Engine Bracket 55 40.5 -
Bolt-Front Engine Mount to Front Axle Carrier 35 26 -
Bolt-Rear Engine Cross Member to Body 40 30 -
Bolt-Rear Engine Mount to Rear Engine Cross Member 35 26 -
Bolt/Nut- Rear Engine Mount to Transmission 40 26 -
Bolt-Shrowd to Engine Bracket 10 - 88.5
Nut-Front Engine Mount to Engine Bracket 65 48 -
Nut-Engine Mount to Vehicle Frame 35 26 -
Fuel Filter
Bolt-Clip to Fuel Filter 8 - 70
Bolt- Fuel Filter to Charge Air Distribution Pipe 14 - 124
Exhaust System
Bolt- Catalytic Converter Bracket to Crankcase 20 - 177
Clamp-Connection Between Front Exhaust Pipe and Rear Exhaust System 55 41 -
Clip-Front Catalytic Converter to Engine Mount 20 - 177
Nut-Bracket to Tail Pipe 55 40.5 -
Nut-Exhaust Bracket to Threaded Plate of Center Exhaust Pipe 20 - 177
Support-Exhaust Bracket on Transmission 20 - 177
Refrigerant Compressor
Bolt-Refrigerant Compressor to Timing Case Cover 20 - 177
Bolt-Refrigerant Compressor to Bracket 20 - 177
Bolt-Refrigerant Lines to Refrigerant Compressor 20 - 177
Timing Chain, Chain Tensioner
Bolt-Camshaft Sprocket to Exhaust Camshaft 18 - 159
Bolt-Intermediate Gear of High Pressure Pump to Cylinder Head 40 29.5 -
Timing Chain Tensioner to Timing Case Cover 80 59 -
Camshaft
Bolt-Camshaft Bearing Cap to Cylinder Head 9 - 80
Bolt-Driver to Inlet Camshaft 50 37 -
Common Rail Diesel Injection
Bolt-Bango Bolt of Leak Oil Line to Rail 20 - 177
Bolt-Bracket to High Pressure Pump 9 - 80
Bolt-High Pressure Pump to Cylinder Head 14 - 124
Bolt-Pre-delivery Pump to Top Cover of Cylinder Head 9 - 80
Bolt-Pressure Control Valve to Rail (2 stage, torque) 3, 5 - 26, 44
Bolt-Rail to Cylinder Head 14 - 124
Bolt-Shutoff Valve to Cylinder Head 8 - 70
Nut-Pressure Line